Skip to content

case study · Metallurgy / alumina production

Corporate portal modules for Aluminium of Kazakhstan JSC

We built five corporate portal modules for the Pavlodar site of Aluminium of Kazakhstan (ERG) as a subcontractor to the lead systems integrator.

  • 5modules in production
  • 14kreference records migrated
  • < 1 dayapproval time, down from 3-4 days

Challenge

Access, travel and small-purchase requests moved through email and paper memos, while employee, department and cost-centre directories lived in a legacy system. The lead integrator needed additional development capacity for a defined set of modules built to ERG group standards.

What we did

  • Built 5 modules on ASP.NET Core and React: access requests, business travel, small purchases, department directory and a manager dashboard
  • Set up single sign-on via Active Directory and approval routes based on the org chart
  • Migrated 14,000 employee, department and cost-centre records and removed duplicates
  • Passed the integrator code review and load testing
  • Trained administrators and key users and handed over the documentation

Outcome

The modules are in production and formally accepted. A typical request is now approved within hours; it used to take 3-4 days. Managers check the status of their requests themselves, without calls or emails.

let's talk

Need a similar result?

Tell us about your task - we will prepare a technical proposal with stages, timeline and a cost estimate.